| Contact Us | CHT | Mobile | Wechat | Weibo | Search:
Welcome Visitors | 登录 | 免费注册 | 忘记了密码 | 社交账号注册或登录

Home

温哥华资讯

Realty

Education

Finance

Immigrants

Yellow Page

Travel
Search:  

 Global Announcement:  请不要上传第三方有版权的照片,请尊重版权,谢谢   转载新闻请务必注明出处,这些媒体请不要转,谢谢   批评商家需要注意  
 : 白龙王许道长 | NotmeL8 | XY | lxls | 猪头看世界 | 静观云卷云舒 | 顾晓军 | 吕洪来的个人空间 | 罗蓬特机器人 | 客观中立而实事求是,唯服理据而杜绝辱骂 | 逸言堂 | 格局 | 大温房产和地产研究 | 我的退休生活 | 禅人俗事 | 一袭绛襦落鹏城,疑似玄女下九天 | 湖里湖涂 | 天涯逐梦 | My AI Tech Channel | Invisible world
 : 请问谁知道哪里有卖理发的电动推子?   忽然有个疑问:战争时期,加拿大拿PR卡未入籍的永久居民会被强制服兵役吗?   这个银条   如何修改会员名?
 Jump to:
     发帖回帖获取加西镑, 兑换精彩礼物

移民生活北美论坛 Forum Index -> 投资理财

有谁关注TKO吗?和TCM比较一下



Reply to topic          |##| -> |=|        Post new topic
View previous topic :: View next topic  
Author Message
加菲猫tan
()




Post Posted: 2013-1-24 00:32 Reply with quote
今年Q1应该有环评结果出来。 New prosperity号称加国第一,世界第7的铜金混合矿。

谁能比较一下TKO和TCM?
 
|
View user's profile Send private message Topics User photo gallery  
Richmond Signature 马自达精选车型利率0%, 再加$特别折扣!
cans
()




Post Posted: 2013-1-24 11:44 Reply with quote
加菲猫tan _BBCODE_WROTE:
今年Q1应该有环评结果出来。 New prosperity号称加国第一,世界第7的铜金混合矿。

谁能比较一下TKO和TCM?


New prosperity项目主要是湖区的环境污染问题和原住民抗争是在加拿大资源开采活动中争议最大项目,所以要顺利实现开采相当艰难.当前TKO股价完全不考虑New prosperity项目存在.如果说New prosperity项目能开采就如中了649采票.立马番倍.相信最终New prosperity项目能开采,只不过是时间跨度问题.

TCM资产净值数倍TKO,如果说不是Endako Mine扩产决策重大失误,现在股价完全应当在20元/股以上,冶炼厂技术障碍是难以置信事件.一家全世界数一数二钼开采公司,这么可能出现这样情况.总裁应该为该项目失误引咎辞职,但是他的心胸不够开阔,还拖上一年才退休.加拿大监管还是不够严,而且总裁没有为股价暴跌检讨和对股东抱歉,而是强调客观原因和自身非常努力工作.象美国MCP的总裁就引咎辞职.但是我查看了一下地图,TCM另一个项目Berg Property项目就在Endako Mine旁边,是否Endako Mine扩产项目冶炼厂为Berg Property项目准备的一个伏笔.否则Endako Mine扩产项目的6亿多投资几乎傻到了家.

TKO和TCM当前股价仍被低估,TKO能否股价升之10元/股取决New prosperity项目顺利开采,TCM能否升之10元/股取决外界有色金属价格和管理层善待股东.
 
| Back to top
View user's profile Send private message Topics User photo gallery  
cans
()



Post Posted: 2013-1-25 08:33 Reply with quote
根据AZC公司公告,最近已经进入环境保护审批最后时间范围,一但获批,股价将大幅上涨,可关注,公司公告附件:

TORONTO, Nov. 16, 2012 /CNW/ - Augusta Resource Corporation (TSX: AZC) (NYSE: AZC) ("Augusta" or "the Company") announces a permitting update on its Rosemont Copper project following an information session held today by the U.S. Forest Service (USFS).

The USFS has indicated that the permitting process is approximately 90% complete and three major items need to be completed for the last milestone which is the issuance of the final Environmental Impact Statement (EIS) and Record of Decision (ROD). The three items include: the consultation with the U.S. Fish and Wildlife Service which is nearing completion; the consultation with tribes and the State Historic Preservation Office of which the draft Memorandum of Agreement is under review; and, an update of air quality models which will be submitted this month. With the issuance of the final Air Quality Permit by the Arizona Department of Environmental Quality (ADEQ), which is expected by the end of 2012, Rosemont will be deemed to be in compliance with the required federal and state air regulations.

Augusta has reviewed the work that still needs to be completed with the USFS, and expects that the process for the issuance of the final EIS and ROD can be concluded within 60 to 120 days
 
| Back to top
View user's profile Send private message Topics User photo gallery  
加菲猫tan
()



Post Posted: 2013-1-25 12:59 Reply with quote
赌TKO环评通过in Q1!
 
| Back to top
View user's profile Send private message Topics User photo gallery  
cans
()



Post Posted: 2013-1-30 17:55 Reply with quote
Countdown to production at Mount Milligan

Site visit

By: Gwen Preston

FORT ST. JAMES, BRITISH COLUMBIA

2013-01-23

The mine that Thompson Creek Metals (TCM-T, TC-N) is building in central B.C. will be a novel operation in many ways.

For one, it will be the province’s first major new metal mine in 15 years.

The 40-foot, semi-autogenous grinding (SAG) mill will be the largest of its kind on the continent, and the primary crusher is the tallest in Canada.

All of the concrete under the mill and other buildings — the impermeable clay in the tailings storage facility dam, the fill used to build the 110-foot wall that towers above the primary crusher and the rest of the bulk materials used to transform the property into a mine — came from a pervasive layer of glacial till on-site that provided every kind of clay, rock and sand needed.

Because of this synergy, the mine does not need a waste dump. Moreover, the entire mine is contained within an area measuring just 3 by 4 km, which is a small footprint for an open-pit mine with a 22-year life expectancy.

And if the next year goes according to plan, Thompson Creek will finish building this $1.5-billion mine without a cent of conventional debt — which is perhaps the most novel aspect of all.

Mount Milligan is a busy place these days. There were 1,112 people on-site when The Northern Miner visited, and that is down from the busiest times during the 30-month build.

The project is more than 70% complete. The massive SAG mill is installed, along with two ball mills, all the lines of rougher and cleaner flotation cells and the concentrate load-out bay. With the large items in place, workers can seal off the building from the cold winter air. It’s a long-sought goal, after spending last winter completing 36-hour concrete pours and installing a huge, outdoor steel structure in northern B.C. winter conditions.

Work is also continuing outside. In December the company commissioned the second of its massive shovels, both of which are now stripping overburden from the first pit area. A designated fleet of haul trucks take the overburden across the property to the tailings storage facility, where earth-moving machines pile it atop the growing tailings dam.

Meanwhile offices are being wired, machine shops are being outfitted, water pipes and fibre optic cables are being run to every corner of the site, new employees are being trained and a thousand other tasks are being completed in preparation for the targeted start-up in a few months.

At first glance, Mount Milligan is a straightforward operation, an open-pit mine tapping into a near-surface porphyry deposit with metals that respond well to conventional grinding and flotation processes to produce marketable concentrates.

But no new, large mine is ever simple, not even one located fairly close to roads, power and people. In addition, well-designed new mines incorporate a slew of great features, from rolling bales that keep each shovel’s power cable off the ground to a site-specific cell tower, keeping the mine connected to the outside world.

“There are just so many ancillary things involved to get this mine up and running,” Mount Milligan construction manager Bert Jeffries comments. “It feels like I’m the mayor of a village.”

That village is being built to tap into a near-surface copper-gold resource that has been perforated with almost 1,000 drill holes over the last 20 years. The resource is divided into four zones, but all four are connected and fit nicely into two pit shells, known as the North and South pits.

Shallow ore

Mining will start in the North pit because the ore is closer to surface — in some spots, there is just 5 metres of overburden. In fact, easy access to ore is one of Mount Milligan’s virtues. Over the 22-year mine life, the operation’s strip ratio will average just 0.84 to 1 waste to ore.

The deposit at Mount Milligan is a classic porphyry, complete with higher gold grades near-surface that will boost the project’s economics in its early years. The project’s proven and probable reserves total 482.4 million tonnes at an average grade of 0.2% copper and 0.388 gram gold per tonne, for 2.1 billion contained lb. copper and 6 million contained oz. gold.
In addition, the project is home to 224 million measured and indicated tonnes grading 0.15% copper and 0.21 gram gold that are not included in the reserve count.

Two massive electric shovels will pull 100,000 tonnes of rock from the pits each day, including 60,000 tonnes of ore. ‘Shovel’ does not seem a big enough word to describe these machines, which tower more than 100 feet above the ground. With just two and a half bucket loads, one of these shovels can fill a 240-tonne haul truck. And they are electric, each one dragging a power cable fitted with bales that make the cable easier to see and move.

A fleet of 793 Caterpillar haul trucks will receive ore from these shovels and ferry it to the top of a 110-foot, mechanically stabilized earth wall, from where they can dump their loads into the 100-foot-tall primary crusher. There are nine haul trucks on site. As the pit deepens the haul road will get longer — meaning longer trip times. Within two years, Thompson Creek expects to have 12 haul trucks in operation.

A trip through the primary crusher will break the rocks into pieces no larger than 6 inches, which will gather in a stockpile. A conveyor will then take ore from the stockpile into the 40-foot SAG mill, a goliath piece of machinery. Installing the mill was a major challenge. For example, five huge pieces of machined steel hold the mill in place. Each one weighs more tha n 100 tonnes and the bolts that attach them to the surrounding structure are the size of a big cucumber, yet the tolerances for installing these bolts measure in the microns.

After a few minutes in the SAG mill the ore moves on to one of two ball mills, which reduce 80% of the rocks to less than 75 microns. This is the optimal grind size for operation, where the costs of further grinding negate the benefits of higher recoveries from smaller particles.

Once the ore is ground, it’s time to extract the metals. The process facility uses conventional flotation techniques, sending the ground ore slurries through multiple sets of rougher and cleaner flotation tanks, as well as regrind circuits.

“We’re putting $1.5 billion into this facility to get one fifteen-minute shot at it,” Mount Milligan plant manager Patrick Gannon says, describing the rougher and cleaner flotation process. “In those fifteen minutes, you’re either going to get the metal out of the rock or you aren’t.”

Provided it all works, each day the mill will transform 60,000 tonnes of ore into 400 tonnes of concentrate grading 26% copper and 30 grams gold, which translates into average life-of-mine annual production of 81 million lb. copper and 194,000 oz. gold. At first, output will be higher, as the mine processes the gold-enriched upper zones of the deposit, resulting in annual output averaging 262,000 oz. gold for the first six years.

The concentrate will be loaded onto trucks, but the company hasn’t decided where those trucks will go. At first the company planned to truck its product to Fort St. James, where it would be loaded onto railcars for transport west to Prince Rupert. When this plan was established the rail load-out facility in Mackenzie was unavailable, as it was being used to capacity.

Now that has changed, which means Thompson Creek might truck its concentrates to Mackenzie instead. The advantage in sending concentrate north is that the road to Mackenzie is a private one, which avoids the additional concerns that arise when large trucks have to share the road with public users. However the company is not yet sure which route will be chosen.

This describes the flow sheet for the metals, but the gangue goes elsewhere — to the tailings storage facility (TSF). Defined by a dam that contains this fluid mill waste, the TSF will grow deeper as the mine ages because Thompson Creek will continually pile waste rock on top of the dam’s impermeable clay core. Twenty-two years from now, when Mount Milligan is winding down, the deepest parts of the TSF will hold 85 feet of tailings.

More than a mill

“Logistics are one of the biggest challenges in building a mine of this size,” Jeffries says. “All of this construction material — you have to bring it in on big trucks, unload it, deck it and label it, and find it when you need it and transport it to where it’s being installed. The logistics side is just fascinating.”

He has a point. It’s easy to focus on the mill building and the pit equipment, but a mine like Mount Milligan requires extensive supporting infrastructure. For example, the truck shop is massive, with a wash bay that alone is the size of a small factory.

Another good example is the fleet of earth-moving machines dedicated to building the TSF. This fleet is separate from the shovels and haul trucks that move ore, and this second set of machines will also operate for the entire life of the mine, continually adding waste rock to the TSF dam.

Then there’s the need for power: Thompson Creek had to build a 92 km power line along the road from Mackenzie as well as a substation on-site to step the voltage down from 230 kV to 25 kV. From there, a network of lines disperses power throughout the mine site.

The list of ancillary tasks involved in building Mount Milligan continues. Trees had to be cut, sorted and either sold or stored for use in reclamation. Innumerable pumps buried all over the site move water this way and that: through buildings, around the mill, from seepage ponds back into the TSF and from the TSF to the water-recycling facility and back into the mill.

A nursery is being built to grow native plants in preparation for reclamation work. A slew of offices need to be wired and furnished. Classrooms are used to train groups of new workers. Snow has to be cleared constantly from roads and parking lots. Cooks are at work, trying to feed the hundreds of workers passing through the cafeteria every day.

And if the company gets approval, soon another task will be added to the list: building a 450-room residence on-site.

Mount Milligan is located 100 km northwest of Prince George in central B.C. There are two routes into the site: a 90 km road north from Fort St. James, or a 92 km road south from Mackenzie.

“Proximity to not just one community but two is a real benefit,” Thompson Creek director of corporate responsibility Jocelyn Fraser says, as she drives to the mine from Fort St. James. “People coming to work here can move with their families, which gives the communities a big boost — it’s great for everyone.”

Initially, the Mount Milligan development team planned to house the mine’s workforce in one of the communities, but it has since become clear that the commute is too long for some. In winter it can easily take an hour and a half to drive each way, which means adding some three hours of transit to workers’ 12-hour shifts.

As such, the company has applied for permission to build a 450-room residence on site. The building will be bigger than necessary — at full capacity, Mount Milligan will require 350 workers and 50 support staff, with 200 expected to live on-site. The extra capacity will be available for contractors or guests.

Paid in full

Thompson Creek is three-quarters of the way through building a $1.5-billion mine, and yet in November the company cancelled its revolving-credit facility because it had no need for it. Indeed, Mount Milligan’s most novel characteristic may be that it was paid for in cash.

A fair chunk of the funding for Mount Milligan came from Thompson Creek’s other mines, though in recent months those operations have struggled. The problem at both mines is low molybdenum prices. After spiking to US$45 per lb. in 2007 from less than US$5 per lb. in 2002, the price of molybdenum oxide has fallen back to US$12 per lb. Both of Thompson Creek’s other mines — the Endako mine in northwest B.C. and the Thompson Creek mine in Idaho — produce moly, so the low price has created headaches.

The company suspended mining at Endako in August, saying that low moly prices were exacerbating problems from operational issues and lower-than-expected ore grades. Mining will not resume at the operation until “moly prices improve.” The company continues to process stockpiled ore at the site.

Less than two months later Thompson Creek suspended stripping activity associated with the next phase of production at its Thompson Creek mine. Mining operations there will continue as planned through 2014, but if moly prices have not improved enough by 2015 to justify the prep work required for the next phase, “the company expects that the mine would be placed on care and maintenance at such time.”

With operations at two mines partially or wholly suspended because of one metal price, it’s no surprise Thompson Creek is excited to get another mine into operation — especially one unrelated to the price of moly. In fact, the feasibility study and reserve estimate for Mount Milligan used a copper price of US$1.60 per lb. and a gold price of US$690 per oz., which means the mine should be economic at prices some 40% below current spot rates.

But that only matters once the mine is up and running, so Thompson Creek had to ensure it had enough money to finish building Mount Milligan, even without much cash flow from its moly mines. To fill any potential funding gaps, Thompson Creek raised $350 million near the end of 2012 by selling high-yield debt on the bond market. The company offered senior secured first-priority notes that carry a yield of 9.75%. This is the only debt that Thompson Creek will carry once Mount Milligan is complete.

The company also pulled in cash through a series of deals with gold-streaming company Royal Gold (RGL-T, RGLD-Q). Most recently Royal Gold handed over $200 million for the right to buy an additional 12.25% of Mount Milligan’s gold at US$435 per oz. (or the prevailing market price, if lower). The streaming company previously bought the right to buy 40% of the mine’s gold production in two separate deals, which means Royal Gold is set to purchase 52.25% of Mount Milligan’s gold. For this right, the streaming company has invested a total of $781.5 million.

With the additional Royal Gold monies and funds from the bond issuance, Thompson Creek is in fine shape. The company has already spent almost $1 billion at Mount Milligan, leaving $500 million to go.

The company plans to commission the mine in this year’s third quarter, with the goal of reaching commercial production before year-end.
 
| Back to top
View user's profile Send private message Topics User photo gallery  
cans
()



Post Posted: 2013-1-31 14:22 Reply with quote
cans _BBCODE_WROTE:
根据AZC公司公告,最近已经进入环境保护审批最后时间范围,一但获批,股价将大幅上涨,可关注,公司公告附件:

TORONTO, Nov. 16, 2012 /CNW/ - Augusta Resource Corporation (TSX: AZC) (NYSE: AZC) ("Augusta" or "the Company") announces a permitting update on its Rosemont Copper project following an information session held today by the U.S. Forest Service (USFS).

The USFS has indicated that the permitting process is approximately 90% complete and three major items need to be completed for the last milestone which is the issuance of the final Environmental Impact Statement (EIS) and Record of Decision (ROD). The three items include: the consultation with the U.S. Fish and Wildlife Service which is nearing completion; the consultation with tribes and the State Historic Preservation Office of which the draft Memorandum of Agreement is under review; and, an update of air quality models which will be submitted this month. With the issuance of the final Air Quality Permit by the Arizona Department of Environmental Quality (ADEQ), which is expected by the end of 2012, Rosemont will be deemed to be in compliance with the required federal and state air regulations.

Augusta has reviewed the work that still needs to be completed with the USFS, and expects that the process for the issuance of the final EIS and ROD can be concluded within 60 to 120 days





Augusta's Rosemont Copper Project Receives Air Quality Permit

Augusta Resource Corp.

AZC | 1/31/2013 12:41:00 PM



Augusta's Rosemont Copper Project Receives Air Quality Permit



VANCOUVER, Jan. 31, 2013 /CNW/ - Augusta Resource Corporation

(TSX/NYSE MKT: AZC) ("Augusta" or "the Company") is pleased to announce that it has received the Air Quality Permit for its Rosemont Copper project from the Arizona Department of Environmental Quality ("ADEQ"). The Air Quality Permit stipulates the operating, monitoring and reporting parameters that Rosemont must comply with to meet all federal, state and local air quality requirements.

Rosemont has now received seven major permits required to commence construction. Only one major permit is remaining, the Clean Water Act Section 404 Permit from the US Army Corp of Engineers, which the Company expects to receive upon the issuance of the Record of Decision ("ROD") on the Plan of Operations from the U.S. Forest Service ("USFS").

Gil Clausen, Augusta's President and CEO said, "Having received one of the last permits remaining represents a major achievement for the Rosemont Copper project as we near the end of the permitting process and prepare for construction this year. This success demonstrates our commitment to set high standards for environmental protection by operating with enhanced emission controls that go beyond regulatory requirements. Further, we would like to commend the ADEQ for advancing the permitting process for the Air Quality Permit thoroughly, professionally and expeditiously."
 
| Back to top
View user's profile Send private message Topics User photo gallery  
biglou
()



Post Posted: 2013-2-21 18:10 Reply with quote
TCM回落到3.6了.......
 
| Back to top
View user's profile Send private message Topics User photo gallery  
webweb01
()



Post Posted: 2013-2-25 12:18 Reply with quote
TCM回落到.... back to 3 ...
 
| Back to top
View user's profile Send private message Topics User photo gallery  
biglou
()



Post Posted: 2013-2-25 19:04 Reply with quote
我4块多就撤了,知道多少左右可以再进吗?
 
| Back to top
View user's profile Send private message Topics User photo gallery  
webweb01
()



Post Posted: 2013-2-26 01:10 Reply with quote
米兔

看TA 5天线上20天线,三块一下 。。。
 
| Back to top
View user's profile Send private message Topics User photo gallery  
 
Reply to topic     |##| -> |=|     移民生活北美论坛 Forum Index -> 投资理财 All times are GMT - 8 Hours
Page 1 of 1


注:
  • 以上论坛所有发言仅代表发帖者个人观点, 并不代表本站观点或立场, 加西网对此不负任何责任。
  • 投资理财及买房卖房版面的帖子不构成投资建议。投资有风险,责任请自负
  • 对二手买卖中的虚假信息,买卖中的纠纷等均与本站无关。
  • 黄页热门商家 免费个人广告
    金钥匙会计事务所—收费低标准,服务高质量!
    温哥华房贷专家Alan Zhang 张健——专业房贷,诚挚高效!
    温哥华孙鹏英特许会计师事务所
    温哥华商业住宅贷款专家Ruby Fan
    温哥华华枫金融:量身定制 汇率最优 安全即时
    温哥华章亚飞会计事务所
    发布商业广告

    You cannot post new topics in this forum
    You cannot reply to topics in this forum
    You cannot edit your posts in this forum
    You cannot delete your posts in this forum
    You cannot vote in polls in this forum
    You cannot attach files in this forum
    You can download files in this forum

    Jump to: 

    加菲猫tan, cans, cans, 加菲猫tan, cans, cans, biglou, webweb01, biglou, webweb01
    潜力帖子 精华帖子 热门帖子
    主旋律中文的奥妙,造诣差点就看不出
    突然之间!全国上下都开始这个活动...
    郝海东,你完了!
    乱了!完了!跑到腿都抽筋了,也没...
    没完没了的等候
    印度举白旗投降了
    川普会见卡尼
    离谱 大温超800张选票就这样被忘了
    渤海国
    驵勉诚辛格突然辞职!NDP新党魁戴伟...
    战机是阵风还是大疆?
    最是一年春好处:总结经验,吸取教...
    元初的参鸡汤
    刘厅长大叔
    世界美食天堂之 ---- 西班牙马略卡 ...
    5月2日换币盛况
    维达大师,另类收藏,请您欣赏!
    清代福州台伏钞票
    四川官钱局钞票
    大汉四川军政府军用银票
    今年新币发行计划
    要出一个新的一元
    古董金币
    mint三月新币(四月新币从22楼起)
    1999 mule 25分
    2025 蛇年敲币活动
    加拿大新总理马克卡尼
    我在小红书被骂穷得没钱给孩子买衣服
    美国2025年AWQ(美国妇女25c)发行计划
    韩国空难FDR黑匣子缺失最后四分钟关...
    皮尔今天在温哥华 - 蓝色wave - 保...
    几分钟前,中国强硬反击,征34+50,...
    曼谷高楼直接倒了
    我说我希望特朗普赢,老公气得眼睛...
    知乎?加西网上为什么有老男人喜欢...
    明明有能力统台,大陆为何迟迟不动手?
    貌似ndp稍占上风。。。。。
    今天是感恩节,跟大家道个别,以后...
    咱最后还是投了ndp
    生平第一次被偷车了
    中国会不会武统台湾
    突发:台湾队战胜中国队奥运夺冠,...
    温哥华房姐出事了
    有在看总统辩论的吗?
    退休几年后的感悟

    最新新闻 热门新闻 热评新闻
    打破迷思 哈佛研究揭长寿关键:不是饮食、运动
    去年落马 前国家体育总局局长被提起公诉
    中国拒买波音恐遭报复?外媒曝C919关键硬伤
    周渝民公开感谢大S 当年抑郁症发时"她接住我"
    梵蒂冈新教皇选举秘密会议 用餐规则令人吃惊
    黑人活动家脸被绣在三角裤上?LV创意总监遭猛批
    看完刑警的日子,再看执法者们,我想说: 真是没有对比就没有伤害
    美联储维持利率不变 鲍威尔:"不确定性非常之高"
    拜登批评特朗对俄罗斯的绥靖政策"愚蠢"
    首播拿下榜单第一,高叶让观众成功入坑,女性爽剧有天花板了
    成毅赢麻了!《赴山海》延播,《英雄志》要上桌了?
    28岁美女一夜变老,11年后才得知真相
    不是日本 纽时:川普将宣布与英国达成协议
    《浪姐6》三公解析:2人持续下降 祝绪丹有望反弹
    周扬青只谈姐弟恋!不要彩礼,注重伴侣的外貌。
    盘点!对比7年前 中美贸易谈判现3大不同
    遗憾 颇受欢迎夜市因这事被迫停办
    "超国民待遇"! 110北京医学部外籍生48个来自非洲
    快讯!鲍威尔"亮剑"川普 宣布维持利率不变
    唏嘘!中国超市巨头退市 董事长火线辞职
    马斯克用的减肥"神药"爆了 1季度狂卖$80多亿
    多伦多"丐帮"开全新SUV乞讨被拍
    勿对中美会谈期待过高 谈判恐将旷日持久
    揪心 加国两幼儿家中走失超过六天
    "公认零差评"的6部高分网剧,全程高能无尿点,没看过的只可惜
    特殊时刻 大事密集发生 背后是惊天巨变
    阿省省长回呛福特"反分裂"言论:管好你自己
    美中会谈互给面子 川普是认真的吗?
    美国民众对亚裔看法调查结果出炉 令人不安
    美小额包裹免税结束 广州外贸服装工厂陷困境
    离谱 大温超800张选票就这样被忘了
    省长这样称温村街头袭击犯 引争议
    博励治惨 补选恐被塞200名竞争者
    赶紧加油!本周大温油价就要起飞
    川普将宣布"震撼世界"大消息?不是惊奇就是惊吓
    一张中共军委合照 暗藏权斗内幕
    家长懵 大温这学区面临大规模消减
    特朗普的戏精本色 卡尼在旁边喝汤
    特斯拉销量崩盘 发布Cybercab无线充电力挽狂澜?
    拒绝出席 三胖和普大帝闹掰了(图
    中国决定"谈判" 小粉红崩溃:说好抵抗到底呢?
    揪心 加国两幼儿家中走失超过六天
    "超国民待遇"! 110北京医学部外籍生48个来自非洲
    快讯!鲍威尔"亮剑"川普 宣布维持利率不变
    唏嘘!中国超市巨头退市 董事长火线辞职

    更多方式阅读论坛:

    Android: 加西网
    [下载]

    Android: 温哥华论坛
    [下载]

    PDA版本: 论坛

    加西网微信

    加西网微博


    Powered by phpBB 2.0.8
    Terms & Conditions    Privacy Policy    Political ADs    Activities Agreement    Contact Us    Sitemap    

    加西网为北美中文网传媒集团旗下网站

    Page Generation: 0.0655 Seconds and 6 DB Queries in 0.0016 Seconds